• Who We Are
    • About Us
    • People
  • What We Do
    • Planning
    • Projects
    • Awards
  • How We Work
    • Services
    • Process
  • News
  • Contact
  • Job Opportunities
  • Client Portal

Marotta/Main Architects

  • Who We Are
    • About Us
    • People
  • What We Do
    • Planning
    • Projects
    • Awards
  • How We Work
    • Services
    • Process
  • News
  • Contact
  • Job Opportunities
  • Client Portal
  • Menu
240522_New Entry Close Up View_Less Texture.png
240610_District Office From Ramp_Option 2.png
240610_District Office Toward Existing School Wall.png
240610_Second Floor Long Toward Ramp.png
240610_Stair Tower Toward Corridor.png
240610_Second Floor Toward Ramp.png
240610_Second Floor Toward Art Rooms.png
240522_New Entry Full View_Less Texture.png
240522_New Entry Close Up View_Less Texture.png 240610_District Office From Ramp_Option 2.png 240610_District Office Toward Existing School Wall.png 240610_Second Floor Long Toward Ramp.png 240610_Stair Tower Toward Corridor.png 240610_Second Floor Toward Ramp.png 240610_Second Floor Toward Art Rooms.png 240522_New Entry Full View_Less Texture.png

Coming Soon: Warrior Run School District

May 5, 2025

Warrior Run Jr/SR High School Classroom addition

The Warrior Run Classroom Addition project is part of the Jr/Sr High School renovation process that started in 2022. After a feasibility study process, the District decided to proceed with the demolition of the existing HS building. A new three-story classroom wing will be completed in 2026, and the project will include the conversion of the old building footprint into a new parking for students and staff, covering an underground stormwater management system. The ground floor of the addition will be dedicated to Technical Education. It will include a wood shop, finish room, metal shop, cad lab, engine lab and an agriculture classroom with plant and animal labs. These are connected to the exterior space with a greenhouse. On the first and second floors will be eight new classrooms, an FCS space, and an art suite that includes two classrooms, a pottery room, and a computer/photography room. The first floor will also host the new District Office.

Future projects will include the renovation of the existing spaces as well as the creation of the new entry to the main gym and a new fitness center.

 
k-12 »
 

Project Details

Location:
Turbotville, PA

Size:
36,000 sf

Disciplines:
Architecture
Renovation & Addition

Sectors:
K-12 Education

 
In k-12 education, school Tags architecture, Renovations, Pennsylvania, Turbotville, Warrior Run School District, Warrior Run Jr/Sr High School, additions
Coming Soon: Muhlenberg School District →

filter by discipline

The collection this block was previously pointing to has been removed. Please select another.

filter by sector

The collection this block was previously pointing to has been removed. Please select another.